chore: update SBOM for Python 3.12 (#5199) #8977
testing.yml
on: push
Documentation
2m 39s
Long tests on Python 3.13
12m 11s
Long tests on Python 3.13 (language parsers)
5m 7s
Long tests on Python 3.13 (scanners)
45m 13s
Long tests on Python 3.13 (synchronous)
8m 59s
Tests that may fail due to network or HTML
2m 49s
Windows long tests
1h 3m
Matrix: Linux tests
Annotations
9 errors
|
Long tests on Python 3.13 (synchronous)
The operation was canceled.
|
|
Linux tests (3.11)
Process completed with exit code 1.
|
|
Linux tests (3.9)
The strategy configuration was canceled because "tests._3_11" failed
|
|
Linux tests (3.10)
The operation was canceled.
|
|
Linux tests (3.10)
The strategy configuration was canceled because "tests._3_11" failed
|
|
Linux tests (3.12)
The operation was canceled.
|
|
Linux tests (3.12)
The strategy configuration was canceled because "tests._3_11" failed
|
|
Long tests on Python 3.13
Process completed with exit code 1.
|
|
Windows long tests
Process completed with exit code 1.
|